HD and PD · Checked 14 Jul to 12 Nov 2026 · One-page sheet for the binder

In short

  • The comprehensive assessment is done within 30 days or 13 HD sessions of starting, whichever is later (PD: 30 days). The plan of care is under way by then too.1,2
  • The CMS-2728 is submitted in EQRS within 45 days of the admit date on the form. Saved isn't submitted.1,3,4
  • A reassessment comes within 3 months of the first assessment, and a practitioner visit every month.1,2
  • Medicare usually begins in month 4 of dialysis. It can begin in month 1 if home training starts before the waiting period ends and the physician certifies the patient will finish it and dialyze themselves.5
  • With employer coverage, that plan pays first for the first 30 months of Medicare entitlement.6,7

Two sets of clocks

The facility's, in days

  1. Comprehensive assessment30 days or 13 HD sessions, whichever is later1,2

    from the first outpatient session

  2. Plan of care begins30 days or 13 HD sessions, whichever is later1,2

    from admission

  3. CMS-2728 submittedWithin 45 days1,3,4

    from the admit date on the form

  4. ReassessmentWithin 3 months1,2

    from the initial assessment

Drawn to scale in calendar days. The reassessment bar assumes the first assessment took the full 30 days.

Medicare's, in months of dialysis

  1. Waiting periodMonths 1 to 35

    from the month dialysis begins

  2. Medicare entitlementBegins month 45

    the first day of the third month after dialysis begins

  3. Employer plan pays first30 months6,7

    from the first month of entitlement

  4. Medicare pays firstMonth 34 on6,7

    after the coordination period

For a patient who starts in-center and has employer coverage. Home training that starts early can move entitlement to month 1, under the conditions above.

The detail

Two sets of clocks start at the first outpatient treatment. The facility's: an assessment and a plan of care within the later of 30 days or 13 HD sessions (30 days for PD), and the CMS-2728 filed within 45 days. Medicare's: entitlement on the first day of the third month after dialysis begins, sooner if home-dialysis training starts early, and, for someone with employer coverage, 30 months in which that plan pays first.1,2,3,5,6 Each clock has a different owner, and a missed one rarely announces itself.

Applies to
HD and PD
Checked
14 Jul to 12 Nov 2026
By
John Cruz, RN
Covers
The facility's and Medicare's clocks from the first outpatient treatment, HD and PD, following the employer-coverage case
Doesn't cover
Medicare Advantage and Medicaid payer order; transplant referral timelines; state rules

The new-patient clocks

One-page sheet for the binder

How much the 8 lines below bind

  • 8 Required
Every clock that starts with a new patient, who it binds, and when it starts. HD and PD share them except where the row says otherwise.
ClockWhat it saysClockHow much it bindsApplies toWhere it says so
Initial comprehensive assessment
Complete the initial comprehensive assessment for every new patient.“within the latter of 30 calendar days or 13 outpatient hemodialysis sessions”PD has no session count, so the clock is 30 days (V557).
Later of 30 calendar days or 13 outpatient HD sessions (PD: 30 days)From the first outpatient dialysis session
Requiredregulation, to stay certified
HD and PD
Where it says so · applies to
Plan of care begins
Begin implementing the initial plan of care.For patients with more than 3 treatments a week (PD, daily or nocturnal HD), the guidance expects 30 days from admission, not counting days in the hospital.
Later of 30 calendar days or 13 outpatient HD sessions (PD: 30 days)From admission to the facility
Requiredregulation, to stay certified
HD and PD
Where it says so · applies to
Follow-up reassessment
Complete a follow-up comprehensive reassessment to adjust the plan of care.
Within 3 monthsFrom completion of the initial assessment
Requiredregulation, to stay certified
HD and PD
Where it says so · applies to
CMS-2728 filed in EQRS
Submit the CMS-2728 (the medical evidence report) in EQRS. A saved form isn't a submitted one; only Submit meets the deadline.
Within 45 daysFrom the admit date on the form (Field 24)
Requiredregulation, with CMS program instructions, to report
HD and PD
Where it says so · applies to
Practitioner visit
Every patient is seen by a physician, nurse practitioner (NP), clinical nurse specialist (CNS) or physician's assistant (PA) at least monthly, shown by a monthly progress note.
At least monthlyFrom admission
Requiredregulation, to stay certified
HD and PD
Where it says so · applies to
Medicare waiting period
Medicare entitlement begins the first day of the third month after the month regular dialysis begins. A January start means April 1.
Month 4From the month regular dialysis begins
Requiredregulation, for payment
HD and PD
Where it says so · applies to
42 CFR 406.13(e)Applies to: HD and PD
Waiver with home training
If home (self-dialysis) training begins before the waiting period ends, the physician certifies the patient is expected to finish it and self-dialyze, and dialysis continues through what would have been the waiting period, entitlement begins with the first month of dialysis.
Month 1From the first month of dialysis, when training starts early
Requiredregulation, for payment
Home (PD and home HD)
Where it says so · applies to
42 CFR 406.13(e)(4)Applies to: Home (PD and home HD)
Coordination period
During the coordination period an employer group health plan pays first and Medicare second.
30 monthsFrom the first month of ESRD entitlement, or earlier if the person would have been entitled had they applied
Requiredstatute, for payment
HD and PD
Where it says so · applies to

Where it can break

Each break sits at a handoff on the path below. A silent one gives no signal when it happens.

  1. Break A: Between CMS-2728 filed in EQRS and Medicare entitlement Fails silently

    The CMS-2728 is saved in EQRS but never submitted, or submitted late.

    Who feels it: The patient, whose federal ESRD record does not open on time, and the facility.

    How it shows up: A saved form looks finished from the facility's side, but it has not been filed, and the 45-day clock keeps running.

    What catches it: The form's status in EQRS shows whether it was submitted. A saved form on the facility's checklist doesn't. The clock is 45 days from the admit date.

  2. Break B: Between Medicare entitlement and coordination period

    Employer coverage is not captured at admission, so Medicare is billed first during the coordination period.

    Who feels it: The facility, which may have to return Medicare's payments and rebill the employer plan, and the patient caught in the correction.

    How it shows up: Claims appear to pay normally; the error surfaces only when the payer order is checked.

    What catches it: The coverage recorded at admission shows it: every source, and which one pays first, before the first claim goes out.

The path

First treatment to Medicare primary. Each lane is a role. StepRecordWaitCan break hereFails silently The same path is listed below.
The path as a list, step by step
  1. 1

    First outpatient treatment

    Nursing staff · Day 0

    A new patient to assess → Interdisciplinary team

  2. 2

    Comprehensive assessment

    Interdisciplinary team · Later of 30 days or 13 HD sessions (PD: 30 days)

    The assessment → Interdisciplinary team

  3. 3

    Plan of care

    Interdisciplinary team · Later of 30 days or 13 HD sessions (PD: 30 days)

    Medical evidence for the form → Facility data staff

  4. 4

    CMS-2728 filed in EQRS

    Facility data staff · Within 45 days

    Break A, fails silently: The filed CMS-2728, alongside the person's own Medicare application through Social Security → CMS

  5. 5

    Medicare entitlement

    CMS · Month 4 of dialysis (month 1 with early home training)

    Break B: Entitlement, and the start of the coordination period → Employer group health plan

  6. 6

    Coordination period

    Employer group health plan · 30 months from the first month of entitlement

    The end of the coordination period → Medicare Administrative Contractor (Waits 30 months)

  7. 7

    Medicare becomes primary

    Medicare Administrative Contractor · Month 34 of dialysis (standard waiting period)

What each step's record proves, and what it doesn't
7 steps, in order.
StepWhoProvesDoesn't proveRule
1. First outpatient treatment
Nursing staffDay 0
Care began on this date.
That the person has coverage, or that anything has been filed.
RequiredThe assessment and plan-of-care clocks start here (494.80(b), 494.90(b)); Medicare's waiting period counts from the month regular dialysis begins (406.13(e)).1,5
2. Comprehensive assessment
Interdisciplinary teamLater of 30 days or 13 HD sessions (PD: 30 days)
The team has assessed the person.
That a plan of care is in place.
RequiredWithin the latter of 30 calendar days or 13 outpatient HD sessions from the first outpatient session (494.80(b)(1)); a follow-up reassessment within 3 months after that (494.80(b)(2)).1,2
3. Plan of care
Interdisciplinary teamLater of 30 days or 13 HD sessions (PD: 30 days)
Care has measurable goals and an owner.
That coverage or billing is in order.
RequiredImplementation of the initial plan must begin within the latter of 30 calendar days after admission or 13 outpatient HD sessions (494.90(b)(2)).1,2
4. CMS-2728 filed in EQRS
Facility data staffWithin 45 days
The federal record is open, once the form is submitted.
That the person is entitled to Medicare.
RequiredFacilities furnish data to CMS at the intervals CMS specifies (494.180(h)). The CMS-2728 is submitted in EQRS within 45 days of the admit date, and it counts only once submitted, not just saved.1,3,4
5. Medicare entitlement
CMSMonth 4 of dialysis (month 1 with early home training)
Medicare can pay for covered services from this date.
That Medicare pays first.
RequiredEntitlement begins on the first day of the third month after the month regular dialysis begins: a January start means April 1. If home (self-dialysis) training starts before the waiting period ends, with the physician certifying the patient is expected to finish it and self-dialyze, and dialysis continues through what would have been the waiting period, it begins with the first month of dialysis (406.13(e)(4)).5,8
6. Coordination period
Employer group health plan30 months from the first month of entitlement
Which payer is billed first.
That the person has employer coverage. Without it, Medicare is primary from entitlement.
RequiredMedicare is secondary to a group health plan during the coordination period (411.162(a)). The statute sets that period at 30 months for services since August 5, 1997, counted from the first month of Medicare entitlement, or earlier if the person would have been entitled had they applied.6,7
7. Medicare becomes primary
Medicare Administrative ContractorMonth 34 of dialysis (standard waiting period)
Medicare is the primary payer.
Who covers the 20% coinsurance.
RequiredThe group health plan's primary period ends with the 30 months; claims then go to the MAC with Medicare primary. With a standard waiting period that's the 34th month of dialysis.6,9

What this page can't tell you

  • Why the regulation and the statute disagree on the coordination period. 42 CFR 411.162 still reads 12 months for people entitled after September 1997; the 1997 amendment to the statute substituted 30, and the statute governs.6,7
  • Who pays first under Medicare Advantage, Medicaid or other coverage. This page follows the employer-coverage case.

Next

Sources

  1. 42 CFR Part 494 (§§ 494.20-494.180)42 CFR Part 494 · read at the issuer · checked 11 Nov 2026
  2. State Operations Manual, Appendix H: Guidance to Surveyors, ESRD Facilities (Rev. 246)CMS Pub. 100-07, Transmittal 246 (issued, effective and implemented 2026-08-17), SOM Appendix H Parts I-III · read at the issuer · checked 11 Nov 2026
  3. CMS-2728 / CMS-2744 / CMS-2746CMS forms 2728 / 2744 / 2746 · read at the issuer · checked 11 Nov 2026
  4. ESRD Network tip sheet: Form CMS-2728 in EQRSAlliant Health Solutions (ESRD Networks), ESRD 2728 Tip Sheet (2023) · secondary · checked 12 Nov 2026
  5. 42 CFR 406.1342 CFR 406.13 · read at the issuer · checked 14 Jul 2026
  6. Social Security Act 1862(b)(1)(C), 42 U.S.C. 1395y(b)(1)(C)42 U.S.C. 1395y(b)(1)(C) · read at the issuer · checked 10 Nov 2026
  7. 42 CFR 411.16242 CFR 411.162 · read at the issuer · checked 14 Jul 2026