Middle Molecule Find

Back to the full page · Print or forward this page

After a survey

Checked
5 to 11 Nov 2026
By
John Cruz, RN

What you owe after a survey cites a deficiency, and the deadlines that start.

Grouped by how much each line binds.
LineWhat it saysBindsWhere it says so
Required
Acceptable plan required
A facility with standard-level deficiencies stays certified only if it submits an acceptable plan of correction.
Required
42 CFR 488.28(a)
Correction
Deficiencies are corrected within a reasonable time, generally no longer than 60 calendar days; the agency shouldn't accept 60 days routinely when a fix can be made sooner. Clock: Generally no longer than 60 calendar days, from notice of the deficiencies.
Required
42 CFR 488.28(d)
CMS guidance
2567 sent
The state survey agency sends Form CMS-2567, the statement of deficiencies, to the facility. Clock: Within 10 working days, from the last day of the survey.
CMS guidance
SOM ch. 2, §2728
Plan of correction due
The facility returns a signed plan of correction on the 2567. Clock: 10 calendar days, from the facility's receipt of the 2567.
CMS guidance
SOM ch. 2, §2728
What an acceptable plan contains
Four elements for each deficiency: the plan to correct it, addressing the processes that led to it; how the plan will be carried out; how it will be monitored so the correction holds; and the title of the person responsible. Plus a completion date and the signature of the administrator or another authorized official.
CMS guidance
SOM ch. 2, §2728B
How you'll know the level
For a condition-level finding, the agency sends a warning letter with the 2567 on the 10th working day, naming a recommended termination date. In Appendix H every Condition has its own tag (infection control is V110; its standards follow from V111). Clock: Sent with the 2567, on the 10th working day, from the date of the survey.
CMS guidance
SOM ch. 3, §3012
Condition-level finding
A condition-level deficiency starts a termination track: a warning letter with the 2567 and a recommended termination date. A plan can't certify the Condition as met; only compliance verified on revisit stops it. The 90 days count from the survey date, so part of them have passed by the time the 2567 arrives. Clock: Termination within 90 calendar days; a revisit within 45 days on a credible allegation of compliance; at most two revisits, from the date of the survey.
CMS guidance
SOM ch. 3, §3012
Immediate jeopardy
Immediate jeopardy: the facility is told within 2 working days and the public by the fifth. Removing the threat ends the 23-day clock; if condition-level deficiencies remain, the 90-day track continues. Clock: Termination on the 23rd calendar day; up to 90 days in total if the threat is removed but condition-level deficiencies remain, from the date of the survey.
CMS guidance
SOM ch. 3, §3010
2567 can be public
The 2567 can be released to the public as soon as the facility receives it. The plan of correction is released once it's approved. Clock: On receipt, from the facility's receipt of the 2567.
CMS guidance
QSO-25-19-ALL, Updated Timeframe for Release
Disagreeing with a finding
Disagreement is written on the 2567 beside the deficiency. It doesn't pause a termination clock, and only evidence that a finding is inaccurate is considered, not arguments about its seriousness.
CMS guidance
SOM ch. 2, §2728B
Exit conference
At the exit conference surveyors give preliminary findings in order of severity, without V-tags. Clock: Last day of the survey, from the end of the survey.
CMS guidance
Appendix H (Rev. 246), Part II, Exit Conference

What this sheet can't tell you

  • State rules and accrediting organization standards aren't covered.

Sources, read 5 to 11 Nov 2026: SOM ch. 2 (cms.gov) · Form CMS-2567 (cms.gov) · 42 CFR 488.24-488.28 (ecfr.gov) · SOM ch. 3 (cms.gov) · Appendix H (Rev. 246) (cms.gov) · QSO-25-19-ALL (cms.gov)