Topics › Surveys and citations
After a survey
What you owe after a survey cites a deficiency, and the deadlines that start.
- Applies to
- HD and PD
- Checked
- 5 to 11 Nov 2026
The rules
One-page sheet| Line | What it says | Clock | How much it binds | Where it says so | |
|---|---|---|---|---|---|
| Required | |||||
| Acceptable plan required | A facility with standard-level deficiencies stays certified only if it submits an acceptable plan of correction.“only if the provider or supplier has submitted an acceptable plan of correction” | None | Requiredregulation, to stay certified | Where it says so | |
| Correction | Deficiencies are corrected within a reasonable time, generally no longer than 60 calendar days; the agency shouldn't accept 60 days routinely when a fix can be made sooner. | Generally no longer than 60 calendar daysFrom notice of the deficiencies | Requiredregulation, read with CMS survey guidance, to stay certified | Where it says so | |
| CMS guidance | |||||
| 2567 sent | The state survey agency sends Form CMS-2567, the statement of deficiencies, to the facility. | Within 10 working daysFrom the last day of the survey | CMS guidanceCMS survey guidance | Where it says so | |
| Plan of correction due | The facility returns a signed plan of correction on the 2567. | 10 calendar daysFrom the facility's receipt of the 2567 | CMS guidanceCMS survey guidance | Where it says so | |
| What an acceptable plan contains | Four elements for each deficiency: the plan to correct it, addressing the processes that led to it; how the plan will be carried out; how it will be monitored so the correction holds; and the title of the person responsible. Plus a completion date and the signature of the administrator or another authorized official. | None | CMS guidanceCMS survey guidance | Where it says so | |
| How you'll know the level | For a condition-level finding, the agency sends a warning letter with the 2567 on the 10th working day, naming a recommended termination date. In Appendix H every Condition has its own tag (infection control is V110; its standards follow from V111). | Sent with the 2567, on the 10th working dayFrom the date of the survey | CMS guidanceCMS survey guidance | Where it says so | |
| Condition-level finding | A condition-level deficiency starts a termination track: a warning letter with the 2567 and a recommended termination date. A plan can't certify the Condition as met; only compliance verified on revisit stops it. The 90 days count from the survey date, so part of them have passed by the time the 2567 arrives. | Termination within 90 calendar days; a revisit within 45 days on a credible allegation of compliance; at most two revisitsFrom the date of the survey | CMS guidanceCMS survey guidance | Where it says so | |
| Immediate jeopardy | Immediate jeopardy: the facility is told within 2 working days and the public by the fifth. Removing the threat ends the 23-day clock; if condition-level deficiencies remain, the 90-day track continues. | Termination on the 23rd calendar day; up to 90 days in total if the threat is removed but condition-level deficiencies remainFrom the date of the survey | CMS guidanceCMS survey guidance | Where it says so | |
| 2567 can be public | The 2567 can be released to the public as soon as the facility receives it. The plan of correction is released once it's approved. | On receiptFrom the facility's receipt of the 2567 | CMS guidanceCMS memo | Where it says so | |
| Disagreeing with a finding | Disagreement is written on the 2567 beside the deficiency. It doesn't pause a termination clock, and only evidence that a finding is inaccurate is considered, not arguments about its seriousness. | None | CMS guidanceCMS survey guidance | Where it says so | |
| Exit conference | At the exit conference surveyors give preliminary findings in order of severity, without V-tags. | Last day of the surveyFrom the end of the survey | CMS guidanceCMS survey guidance | Where it says so | |
What a surveyor can cite
The regulation behind the plan and the 60 days is 42 CFR 488.28; the day counts after a finding live in the State Operations Manual, chapters 2 and 3.
Questions that use it
Sources
- State Operations Manual, Chapter 2: The Certification Process (Rev. 227)CMS Pub. 100-07, Ch. 2 (Rev. 227, issued 2024-12-13), sections 2724, 2727, 2728A to 2728E, 2732A to 2732B, 2734A · read at the issuer · checked 11 Nov 2026
- Form CMS-2567, Statement of Deficiencies and Plan of CorrectionForm CMS-2567 (OMB 0938-0391; the posted version prints an OMB approval expiry of 03/31/2025) · read at the issuer · checked 5 Nov 2026
- 42 CFR 488.24, 488.26 and 488.2842 CFR 488.24, 488.26, 488.28 (eCFR, current through 2026-10-30) · read at the issuer · checked 11 Nov 2026
- State Operations Manual, Chapter 3: Additional Program Activities (Rev. 202)CMS Pub. 100-07, Ch. 3 (Rev. 202, 2020-06-19), sections 3010B, 3012, 3016A, 3016B, 3016E · read at the issuer · checked 11 Nov 2026
- State Operations Manual, Appendix H: Guidance to Surveyors, ESRD Facilities (Rev. 246)CMS Pub. 100-07, Transmittal 246 (issued, effective and implemented 2026-08-17), SOM Appendix H Parts I-III · read at the issuer · checked 11 Nov 2026
- CMS memo QSO-25-19-ALL: Release of CMS-2567 (June 18, 2025)CMS QSO-25-19-ALL (2025-06-18) · read at the issuer · checked 11 Nov 2026
https://middlemolecule.com/rulebook/survey-and-correction/