Middle Molecule Find

Topics › Surveys and citations

What happens after a survey citation?

HD and PD · Checked 5 to 11 Nov 2026 · One-page sheet for the binder · Look up a V-tag

In short

  • You have 10 calendar days from receiving the 2567 to return a signed plan of correction.1,2
  • For each deficiency, the plan says what the fix is, how it's done, how it's checked, and who's responsible (by title). It has a completion date and the signature of the administrator or another authorized official.1
  • Standard-level: you stay certified only if your plan is accepted. Fixes are generally due within 60 days of notice.1,3
  • Condition-level: a 90-day termination clock runs from the survey date. The plan alone doesn't stop it. Only a revisit that finds you back in compliance does.4
  • The 2567 can be made public the day you receive it.5

How long each clock runs

  1. Plan of correction due10 calendar days1,2

    from receipt of the 2567

  2. The 2567 is sent10 working days (14 calendar days without a holiday)1

    from the last day of the survey

  3. Immediate jeopardyTermination on day 23 unless the threat is removed4

    from the survey date

  4. CorrectionGenerally 60 days at most1,3

    from notice of the deficiencies

  5. Condition-level findingTermination by day 90 unless a revisit finds compliance4

    from the survey date

Bars are drawn to scale in calendar days. Each starts from a different moment, named under it.

The detail

A citation starts a written exchange with deadlines. The state survey agency sends Form CMS-2567 within 10 working days, and the facility has 10 calendar days from receipt to return a signed plan of correction; the agency then reviews the plan and verifies the correction.1,2,3 The 2567 can be made public as soon as the facility receives it.5 A condition-level finding runs on a 90-day termination clock that only verified compliance stops.4

Applies to
HD and PD
Checked
5 to 11 Nov 2026
By
John Cruz, RN
Covers
State agency surveys of dialysis facilities, from the exit conference to the verified correction
Doesn't cover
Accrediting organization surveys; state licensure; nursing home timetables

The clocks after a finding

One-page sheet for the binder

How much the 10 lines below bind

  • 2 Required
  • 8 CMS guidance
The level of a finding decides the clock, and disagreeing with a finding doesn't stop one. These are the federal timetables for providers other than nursing homes.
Step or findingWhat it saysClockHow much it bindsWhere it says so
The 2567 is sent
The state survey agency sends Form CMS-2567, the statement of deficiencies, to the facility.
Within 10 working daysFrom the last day of the survey
CMS guidanceCMS survey guidance
Where it says so
The 2567 can be public
The 2567 can be released to the public as soon as the facility receives it. The plan of correction is released once it's approved.
On receiptFrom the facility's receipt of the 2567
CMS guidanceCMS memo
Where it says so
Plan of correction due
The facility returns a signed plan of correction on the 2567.
10 calendar daysFrom the facility's receipt of the 2567
CMS guidanceCMS survey guidance
Where it says so
What the plan has to contain
Four elements for each deficiency: the plan to correct it, addressing the processes that led to it; how the plan will be carried out; how it will be monitored so the correction holds; and the title of the person responsible. Plus a completion date and the signature of the administrator or another authorized official.
None
CMS guidanceCMS survey guidance
Where it says so
Standard-level deficiencies
A facility with standard-level deficiencies stays certified only if it submits an acceptable plan of correction.“only if the provider or supplier has submitted an acceptable plan of correction”
None
Requiredregulation, to stay certified
Where it says so
Correction
Deficiencies are corrected within a reasonable time, generally no longer than 60 calendar days; the agency shouldn't accept 60 days routinely when a fix can be made sooner.
Generally no longer than 60 calendar daysFrom notice of the deficiencies
Requiredregulation, read with CMS survey guidance, to stay certified
Where it says so
How you'll know the level
For a condition-level finding, the agency sends a warning letter with the 2567 on the 10th working day, naming a recommended termination date. In Appendix H every Condition has its own tag (infection control is V110; its standards follow from V111).
Sent with the 2567, on the 10th working dayFrom the date of the survey
CMS guidanceCMS survey guidance
Where it says so
Condition-level deficiency
A condition-level deficiency starts a termination track: a warning letter with the 2567 and a recommended termination date. A plan can't certify the Condition as met; only compliance verified on revisit stops it. The 90 days count from the survey date, so part of them have passed by the time the 2567 arrives.
Termination within 90 calendar days; a revisit within 45 days on a credible allegation of compliance; at most two revisitsFrom the date of the survey
CMS guidanceCMS survey guidance
Where it says so
Immediate jeopardy
Immediate jeopardy: the facility is told within 2 working days and the public by the fifth. Removing the threat ends the 23-day clock; if condition-level deficiencies remain, the 90-day track continues.
Termination on the 23rd calendar day; up to 90 days in total if the threat is removed but condition-level deficiencies remainFrom the date of the survey
CMS guidanceCMS survey guidance
Where it says so
Disagreeing with a finding
Disagreement is written on the 2567 beside the deficiency. It doesn't pause a termination clock, and only evidence that a finding is inaccurate is considered, not arguments about its seriousness.
None
CMS guidanceCMS survey guidance
Where it says so

Where it can break

Each break sits at a handoff on the path below. A silent one gives no signal when it happens.

  1. Break A: Between statement of deficiencies and plan of correction

    The facility plans around the 90 days printed on the form, but the findings can be public the day they arrive.

    Who feels it: Facility leaders and the governing body, who may hear about the findings from outside first, and patients reading findings that do not yet show the facility's plan.

    How it shows up: The 2567's own signature page and Chapter 2 still say 90 days for providers other than nursing homes. CMS memo QSO-25-19-ALL (June 2025) made the 2567 releasable on receipt; the plan is released once approved.

    What catches it: Under the June 2025 memo, the day the 2567 arrives is the day it can be public.

  2. Break B: Between plan of correction and agency review of the plan

    The plan comes back late, unsigned, or missing a date, a monitor or an owner, or it argues how serious the finding is.

    Who feels it: The administrator, who must redo it, and the facility, whose participation depends on an acceptable plan.

    How it shows up: A written rejection and a request for a new plan. A facility can contest a finding's accuracy on the form, but the agency will not consider arguments about its level, scope or severity. A provider that refuses to submit an acceptable plan can be recommended for termination.

    What catches it: Each response can be read against the four elements and the completion date before it's signed. The 10 days run from the day the 2567 arrives.

  3. Break C: Between agency review of the plan and correction on the floor Fails silently

    The plan is carried out as a one-time fix for the examples cited, not a change to the process that produced them, and the monitoring stops once the revisit passes.

    Who feels it: Patients the unchanged process still reaches, and the staff and leaders who face the same finding at the next survey.

    How it shows up: Nothing shows at the time: the revisit follows up on the deficiencies cited, and they are fixed. It surfaces later as the same practice cited again.

    What catches it: The manual asks for a plan that addresses the process behind the finding, with monitoring so the correction holds. Monitoring records that continue after the revisit show that it did.

The path

Exit conference to verified correction. Each lane is a role. StepRecordWaitCan break hereFails silently The same path is listed below.
The path as a list, step by step
  1. 1

    Exit conference

    State survey agency · Last day of the survey

    Findings after supervisory review → State survey agency

  2. 2

    Statement of deficiencies

    State survey agency · Within 10 working days

    Break A: The 2567, to the administrator → Facility leadership

  3. 3

    Plan of correction

    Facility leadership · 10 calendar days after receipt

    Break B: The signed plan, back to the agency → State survey agency

  4. 4

    Agency review of the plan

    State survey agency · On receipt of the plan

    Break C, fails silently: The accepted plan, into daily work → Facility staff

  5. 5

    Correction on the floor

    Facility staff · Ordinarily within 60 days

    Evidence of correction → State survey agency (Up to 60 days)

  6. 6

    Revisit

    State survey agency · After the completion date

    Corrections verified → State survey agency

  7. 7

    Post-certification revisit report

    State survey agency · At the revisit

What each step's record proves, and what it doesn't
7 steps, in order.
StepWhoProvesDoesn't proveRule
1. Exit conference
State survey agencyLast day of the survey
What the team saw and plans to write up.
The final citations, their tags, or their level. The findings can change after State and CMS supervisory review.
CMS guidanceChapter 2 makes the exit an informal meeting on preliminary findings, meant to help the facility start its plan of correction (2724); Appendix H's survey protocol adds the order of severity and no V-tags.1,6
2. Statement of deficiencies
State survey agencyWithin 10 working days
Which requirement the agency found not met, and the evidence it relied on.
Why it happened. Surveyors are told to state what is missing, not why it is missing or how to fix it.
CMS guidanceChapter 2 sets what each citation carries and the 10-working-day mailing (2728, 2728A); surveyors must record findings on federal forms (42 CFR 488.26).1,2,3
3. Plan of correction
Facility leadership10 calendar days after receipt
What the facility commits to, by when, and who owns it.
That anything has changed yet. A plan is a promise until the correction is verified.
RequiredA facility with standard-level deficiencies may keep participating "only if" it submits an acceptable plan of correction (42 CFR 488.28(a)). The 10 days and the four elements come from the manual (Chapter 2, 2728B).1,3
4. Agency review of the plan
State survey agencyOn receipt of the plan
That the plan is acceptable on paper, so the facility can be certified on it while the corrections are under way.
That the correction works. Acceptance judges the plan, not the floor.
CMS guidanceChapter 2, 2728C to 2728E and 2734A. A condition-level deficiency can never be certified on a plan (Chapter 3, 3012).1,4
5. Correction on the floor
Facility staffOrdinarily within 60 days
What was done, as far as the monitoring records show it.
That it holds once attention moves on.
RequiredA facility is ordinarily expected to achieve compliance within 60 days of being notified (42 CFR 488.28(d)); Chapter 2 tells the agency not to accept 60 days routinely when a fix can be made sooner.1,3
6. Revisit
State survey agencyAfter the completion date
Whether each cited deficiency was corrected when it was checked.
That the correction holds after the visit. A revisit is one check on one day.
CMS guidanceChapter 2, 2732A and 2732B. When uncorrected deficiencies affect the facility's ability to meet the Conditions, the agency documents noncompliance and starts a termination action.1
7. Post-certification revisit report
State survey agencyAt the revisit
That the agency verified each listed correction, and when.
That the process behind the finding changed.
CMS guidanceChapter 2, 2732B.1

What this page can't tell you

  • Whether a particular finding of yours, infection control or any other, was cited at the condition level. The letter that comes with the 2567 says so; this page can't.4
  • Whether a later CMS instruction has changed the 10 days or the plan's elements. Chapter 2's plan-of-correction text is 2004 text carried unchanged into the December 2024 revision; no later change was found, but the search wasn't exhaustive.1
  • Whether your state offers dialysis facilities informal dispute resolution. Chapter 3 points to it only for nursing homes; for other providers it says to note the disagreement on the 2567.4
  • The manual and the form still print the older rule that a 2567 is disclosable 90 days after the survey. CMS's June 2025 memo made it releasable on receipt, and this page follows the memo.1,2,5,7

Next

Sources

  1. State Operations Manual, Chapter 2: The Certification Process (Rev. 227)CMS Pub. 100-07, Ch. 2 (Rev. 227, issued 2024-12-13), sections 2724, 2727, 2728A to 2728E, 2732A to 2732B, 2734A · read at the issuer · checked 11 Nov 2026
  2. Form CMS-2567, Statement of Deficiencies and Plan of CorrectionForm CMS-2567 (OMB 0938-0391; the posted version prints an OMB approval expiry of 03/31/2025) · read at the issuer · checked 5 Nov 2026
  3. 42 CFR 488.24, 488.26 and 488.2842 CFR 488.24, 488.26, 488.28 (eCFR, current through 2026-10-30) · read at the issuer · checked 11 Nov 2026
  4. State Operations Manual, Chapter 3: Additional Program Activities (Rev. 202)CMS Pub. 100-07, Ch. 3 (Rev. 202, 2020-06-19), sections 3010B, 3012, 3016A, 3016B, 3016E · read at the issuer · checked 11 Nov 2026
  5. CMS memo QSO-25-19-ALL: Release of CMS-2567 (June 18, 2025)CMS QSO-25-19-ALL (2025-06-18) · read at the issuer · checked 11 Nov 2026
  6. State Operations Manual, Appendix H: Guidance to Surveyors, ESRD Facilities (Rev. 246)CMS Pub. 100-07, Transmittal 246 (issued, effective and implemented 2026-08-17), SOM Appendix H Parts I-III · read at the issuer · checked 11 Nov 2026
  7. 42 CFR 401.13342 CFR 401.133(a) · read at the issuer · checked 5 Nov 2026