V193 Carbon beds: series-connected pairs plumbed in parallel
Written V0193 on the CMS-2567 and in QCOR.
Cited on this tag? What happens after a citation · One-page sheet for the binder
The regulation
ANSI/AAMI RD52:2004 Requirements as Adopted by Reference 42 CFR 494.40 (a)
5.2.5 Carbon adsorption: (banks of tanks)
Carbon beds are sometimes arranged as series-connected pairs of beds so that they need not be overly large. The beds within each pair are of equal size and water flows through them are parallel. In this situation, each pair of beds should have a minimum empty bed contact time of 5 minutes at the maximum flow rate through the bed.
When series connected pairs of beds are used, the piping should be designed to minimize differences in the resistance to flow from inlet and outlet between each parallel series of beds to ensure that an equal volume of water flows through all beds.
CMS's interpretive guidance
Interpretive Guidance § 494.40(a)
Carbon beds may be plumbed in two ways:
- Tanks/beds connected consecutively, so that all of the water flows through both tanks/beds; or
- “Parallel” so that approximately half of the water flows through each set of tanks/beds.
In the case of parallel plumbing (#2), each tank/bed can vary in size, as several smaller tanks would be in use to provide the required empty bed contact time (EBCT). For parallel-connected tanks/beds, there must be sample ports, as addressed at V192, for each set of tanks/banks, as testing of one set of tanks/beds is irrelevant to the function of the other set of tanks/beds.
If block carbon is used to supply dechlorinated water to a portable RO unit, there must be one dual block carbon system (two block carbon or one block carbon and one granular activated carbon tank) per portable RO, and each portable RO must supply one hemodialysis machine, per the manufacturer’s directions.
https://middlemolecule.com/rulebook/tags/v193/