V315 Reprocessing utilities: water, drains, air, power
Written V0315 on the CMS-2567 and in QCOR.
Cited on this tag? What happens after a citation · One-page sheet for the binder
The regulation
ANSI/AAMI RD47:2002/A1:2003 Requirements as Adopted by Reference 42 CFR § 494.50(b)(1)
7.2 Reprocessing systems
7.2.1 Utility requirements
The quality, pressure, flow rate, and temperature of the water used for reprocessing should be specified in the dialyzer reprocessing manual, established before the initiation of a reprocessing program, and maintained thereafter. The manufacturer or designer’s recommendations for the water supply should be followed. Provision should also be made for adequate drains, ventilation, and electrical power.
CMS's interpretive guidance
Interpretive Guidance § 494.50(b)(1)
In the reprocessing area, there must be sufficient drains to accommodate the reprocessing systems, air ventilation equipment to minimize exposure to germicide vapors (as listed in AAMI 8.1 "Reprocessing area and ventilation"), and an adequate number of electrical outlets for the equipment in use.
The pressure of the water used for reprocessing should be monitored. There should be a pressure gauge in the water line of any sink used for dialyzer rinsing, with defined parameters for the accepted pressures to use during that procedure. Dialyzer manufacturers specify maximum pressures for rinsing; exceeding those pressures can result in rupture of the dialyzer membranes and potential blood leaks. Use this tag if there is no pressure gauge in the water line at the rinse sink; use V332 if the manufacturer’s specified pressures are exceeded.
https://middlemolecule.com/rulebook/tags/v315/